Ventura Corporate Towers

Alle 56 Bilder ansehen Daten als PDF Bilder erwerben

Identifikation

Ventura Corporate Towers
Rio Towers
188503

Karte

Struktur allgemein

Wolkenkratzer
existent [fertiggestellt]
Biegesteifer Rahmen
Stahl
Beton
Pfahlgründung
Glas
Granit
Vorhängefassade
schwarz grau dunkelgrün
Modern

Nutzung

Gewerbl. Büroflächen Parken
Einzelhandel

Fakten

  • Construction of Phase A was completed three months ahead of schedule, in July 2008.
  • This building became Rio de Janeiro's 4th tallest building when it was topped out, and the 3rd tallest in Rio´s Downtown Business District.
  • Official dedication was held on August 12, 2010.
  • The building is LEED certified.
  • The building has two helipads.
  • Phase B of this project was topped out in August 2009.
  • There is 2,400 m² of retail dedicated to the entrance levels.
  • The terrain where this building is located was purchased from UFRJ (Universidade Federal do Rio de Janeiro).
  • Excavation works for the Phase B commenced in December 2007.
  • Largest office building in Rio de Janeiro, Rio Sul Center is larger in gross floor area, but it is also a shopping center.
  • In total, there are 42 elevators: 22 in Phase A and 20 in Phase B.
  • Construction of the first phase began in April 2006 and is scheduled for completion by October 2008.
  • Water from both rain and condensation from the air-conditioning systems is used to irrigate the landscaped areas.
  • Phase A of this project was topped out in October 2007.
  • Excavation commenced in March 2006.
  • The site where this building is located has 8550 m² area.
  • The lobby floor-to-ceiling height is 9 meters.
  • Tallest building built in Rio de Janeiro since Rio Sul Center, which was built from 1976 to 1982.
  • The second phase of the project is scheduled to begin by 2009 and end by 2011.
  • In April 2006 the project was renamed from Rio Towers to Ventura Corporate Towers.
  • Construction commenced in April 2006.

Brauchen Sie mehr Informationen zu dem Gebäude und den beteiligten Firmen?

Mehr Informationen

Ort

Avenida Republica do Chile, 300
Rua Silva Jardim
Avenida República do Chile, 300
Centro
Centro
Rio de Janeiro
Rio de Janeiro
Brasilien

Technische Daten

459,32 ft
459,32 ft
459,32 ft
12,14 ft
8,86 ft
38
3
Apr 2006
Aug 2010
42
1.600
$220.000.000

Beteiligte Firmen


Arq e Urb Projetos

Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen

Besondere Eigenschaften

  • Helikopter-Landeplatz ist vorhanden
Fehler gefunden?
Related Buildings