ok Wir nutzen Cookies auf unserer Internetseite, um Ihnen einen bestmöglichen Service zu ermöglichen. Weitere Informationen finden Sie hier.
Ihr Standort

Manitoba Hydro Tower

Alle 21 Bilder ansehen Daten als PDF Bilder erwerben

Identifikation

Manitoba Hydro Tower
Head Office of the Manitoba Hydro-electric Board
218664

Karte

Struktur allgemein

Wolkenkratzer
existent [fertiggestellt]
Beton
Glas
Vorhängefassade
Modern

Nutzung

Gewerbl. Büroflächen

Fakten

  • The building is being designed with the goal of being the most energy-efficient building of its size in North America, if not the world, consuming 60% less energy than prescribed in the national code for buildings.
  • Developers intend to achieve the Leadership in Energy and Environmental Design (LEED) Gold Certification, currently only held by 16 buildings in Canada.
  • Will be 100% cooled and 50% heated by a geothermal system.
  • Number of occupants: 1800, both Hydro and private tenants.
  • Will reuse 90% of building materials from existing buildings demolished on the site.
  • Top of the structure is a solar chimney.
  • Features a double facade, which creates a buffer between the office and outside environments, allowing for more natural ventilation through the north and south atria.

Brauchen Sie mehr Informationen zu dem Gebäude und den beteiligten Firmen?

Mehr Informationen

Ort

360 Portage Avenue
360 Portage Avenue
Winnipeg
Manitoba
Kanada

Technische Daten

377,00 ft
316,60 ft
22
1
2005
22.12.2008
152
$220.500.000

Beteiligte Firmen


KPMB Architects

Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Anzeigen
Fehler gefunden?
Related Buildings